In collaboration with Future Structures NV (Veldeman Goup), Highpoint and Buitink Technology realized the temporary tense structure for the inner courtyard of Carré des Arts in Mons (Belgium).

Dimensions and execution membrane construction

The stretched canvas is constructed in 5 separate sets connected to each other with stainless steel cables. It is possible to modulate the structure by installing only 3 of the 5 modules.

The structure covers the inner courtyard on a total surface of 60m x 25m. The various modules of the stretched fabric are mounted from the ground and lifted using integrated lifting systems with winches.

 